Sungai Besi station
3°3′50.2″N 101°42′28.8″E / 3.063944°N 101.708000°E / 3.063944; 101.708000
Preceding station | Following station | |||
---|---|---|---|---|
Bandar Tasik Selatan towards Sentul Timur | Sri Petaling Line | Bukit Jalil towards Putra Heights | ||
Taman Naga Emas towards Kwasa Damansara | Putrajaya Line | Serdang Raya Utara towards Putrajaya Sentral |
The Sungai Besi station is an elevated integrated metro station in Sungai Besi, a town in the Kuala Lumpur, Malaysia. This station is served by the LRT Sri Petaling line and MRT Putrajaya Line, and it is located in the busiest multiple junctions of the Sungai Besi Expressway between Exit 905 (to Jalan Sungai Besi/Jalan Lingkaran Tengah 2) and Exit 906 (to KESAS Highway).
Station details
Location
The station is located on Jalan Sungai Besi next to the Pekan Sungai Besi and is accessible from Pangsapuri Permai and PPR Raya Permai via a linkbridge.
Exits and entrances
There will be a total of 3 entrances.
Sri Petaling Line / Putrajaya Line station | |||
Entrance | Location | Destination | Picture |
---|---|---|---|
A | East side of Jalan Sungai Besi, Jalan Suasa | Taxi and E-hailing layby, street level access, bus stop, Pekan Sungai Besi, MRT Park and Ride | |
B | West side of Jalan Sungai Besi | Jalan Sungai Besi, Sungai Besi Expressway bus stop via linkbridge | |
P+R | DBKL Park and Ride building | Medan Niaga Tasik Damai (Lakefields) |
Sri Petaling Line
It was first opened in 1996, along with 17 other LRT stations along the LRT line. The principal styling of Sungai Besi LRT Station is similar to most other stations in the line, featuring multi-tiered roofs supported by latticed frames, and white plastered walls and pillars.
Putrajaya Line
The MRT station is opened to public on 16 March 2023, along with 23 other stations from Batu Kentonmen to Putrajaya. This station is one of five elevated-to-elevated interchange stations in the country, after Titiwangsa, KL Sentral, Putra Heights and Kwasa Damansara. It is also one of the four stations in the Putrajaya Line to have side platforms as most stations in the Putrajaya Line have adopted the concept of island platforms.
Planned interchange
The station will also be integrated with the proposed Maju KL KTM Komuter station on the Seremban Line.
External links
- Sungai Besi LRT Station - mrt.com.my Archived 2021-10-05 at the Wayback Machine
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
- Kwasa Damansara
- Rubber Research Institute (planned)
- Kampung Selamat
- Sungai Buloh
- Damansara Damai
- Sri Damansara Barat
- Sri Damansara Sentral
- Sri Damansara Timur
- Metro Prima
- Kepong Baru
- Jinjang
- Sri Delima
- Kampung Batu
- Kentonmen
- Jalan Ipoh
- Sentul Barat
- Titiwangsa
- Hospital Kuala Lumpur
- Raja Uda–UTM
- Ampang Park
- Persiaran KLCC
- Conlay–Kompleks Kraf
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Chan Sow Lin
- Bandar Malaysia Utara (planned)
- Bandar Malaysia Selatan (planned)
- Kuchai
- Taman Naga Emas
- Sungai Besi
- Technology Park (planned)
- Serdang Raya Utara
- Serdang Raya Selatan
- Serdang Jaya
- UPM
- Taman Universiti (planned)
- Taman Equine
- Putra Permai
- 16 Sierra
- Cyberjaya Utara–Finexus
- Cyberjaya City Centre–Limkokwing
- Putrajaya Sentral
Opening 2028-2030 |
|
---|
This Malaysian rapid transit article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e