Tun Sambanthan station
Preceding station | Following station | |||
---|---|---|---|---|
Kuala Lumpur Sentral Terminus | KL Monorail | Maharajalela towards Titiwangsa |
Tun Sambanthan station, is a Malaysian elevated monorail station that forms a part of the Kuala Lumpur Monorail (KL Monorail) line[1] located in Kuala Lumpur and opened alongside the rest of the line and other adjoining monorail stations on 31 August 2003.
Situated at the south side of the Jalan Tun Sambanthan 4-Jalan Tebing (Malay; English: Tun Sambanthan Road 4-River Bank Road) intersection in the Brickfields district of Kuala Lumpur, the station resides at the western bank of the Klang River (or the left bank of the river), just beside Methodist College Kuala Lumpur (MCKL),[2] and the Malaysian Association of the Blind (MAB) opposite Jalan Tun Sambanthan 4. The station is situated close to a pedestrian bridge that crosses the Klang River, connecting the area to Jalan Syed Putra (Syed Putra Road) that adjoins the Federal Highway and the Kuen Cheng High School just opposite the river. The station has only one exit which connects to the west side of Jalan Tebing.
The station is named after V. T. Sambanthan, a notable figure in the Malaysian Indian Congress. Jalan Tun Sambanthan (Tun Sambanthan Road), a main road in Brickfields, is also named after V. T. Sambanthan and is the location of the preceding KL Sentral monorail terminus.[3]
Layout
L2 | Station Platform Level | Side platform |
Platform 1 8 KL Monorail towards MR11 Titiwangsa (→) | ||
Platform 2 8 KL Monorail towards MR1 KL Sentral (←) | ||
Side platform | ||
L1 | Linkway | Staircase Linkway |
G | Station Concourse/Street Level | Faregates, Ticketing Machines, Monorail Station Control, Shops, Taxi Lay-by, Pedestrian Crossing. Entrance A |
Exits and Entrances
The station has only one exit.
Tun Sambanthan KL Monorail station | ||
Entrance | Destination | Picture |
---|---|---|
A | Access to street level ticketing concourse. Jalan Tebing/Jalan Tun Sambanthan |
See also
References
- ^ MR 2 - TUN SAMBANTHAN
- ^ Campus Location - Methodist College Kuala Lumpur Archived 13 May 2011 at the Wayback Machine
- ^ "Monorail Line | MyRapid". www.myrapid.com.my. Archived from the original on 25 September 2012.
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
- Kwasa Damansara
- Rubber Research Institute (planned)
- Kampung Selamat
- Sungai Buloh
- Damansara Damai
- Sri Damansara Barat
- Sri Damansara Sentral
- Sri Damansara Timur
- Metro Prima
- Kepong Baru
- Jinjang
- Sri Delima
- Kampung Batu
- Kentonmen
- Jalan Ipoh
- Sentul Barat
- Titiwangsa
- Hospital Kuala Lumpur
- Raja Uda–UTM
- Ampang Park
- Persiaran KLCC
- Conlay–Kompleks Kraf
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Chan Sow Lin
- Bandar Malaysia Utara (planned)
- Bandar Malaysia Selatan (planned)
- Kuchai
- Taman Naga Emas
- Sungai Besi
- Technology Park (planned)
- Serdang Raya Utara
- Serdang Raya Selatan
- Serdang Jaya
- UPM
- Taman Universiti (planned)
- Taman Equine
- Putra Permai
- 16 Sierra
- Cyberjaya Utara–Finexus
- Cyberjaya City Centre–Limkokwing
- Putrajaya Sentral
Opening 2028-2030 |
|
---|
This Malaysia rail-related article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e